top of page

Richmond Terminal 3

Richmond, CA, USA

Outrigger Industrial is currently managing the construction and development of a 200,000 SF advanced manufacturing Build-to-Suit for Moxion Power.  The property is approximately 15 acres and is located at Terminal 3 in the City of Richmond, California.  The project was preleased to Moxion Power, who will be the long-term occupant and already occupies a portion of the Ford Point building across the street.  Moxion (www.moxionpower.com) plans to utilize the building to build clean energy generators.  This facility will generate approximately 800 local manufacturing jobs, and build approximately 10,000 mobile energy storage units annually which represent over 7GWh of battery capacity.  The building is expected to be delivered Q4 2024.  

Delivery Date:

Q4 2024

Square Feet:

202k

Flyer:
paper_edited.png
Chicago (HQ)

222 South Riverside Plaza
Suite 1500
Chicago, IL 60606

Atlanta

12600 Deerfield Pkwy
Suite 100
Alpharetta, GA 30004

Columbus

6515 Longshore Loop
Unit 100
Dublin, OH 43017

Houston

1790 Hughes Landing Blvd
Suite 400
The Woodlands, Texas 77380

Southern California
Philadelphia

2030 Main Street
Suite 1300
Irvine, CA 92614

101 Lindenwood Drive
Suite 225
Malvern, PA 19355

Copyright 2024 – Outrigger Industrial
email_edited.png
linkedin (1)_edited.png
Nothing contained on this website shall be constructed as an offer to purchase interests or securities in Outrigger or in any of Outrigger's affiliates. Past performance is not indicative of future returns.
bottom of page